Dear Residents:
The Town of Hideout will begin road repairs on Sept 5th, 2023. This work includes pavement patching/replacement, pothole filling, slurry seal, and crack seal. The scheduled completion date is October 13th 2023. You can expect delays on Hideout roadways throughout the duration of the project. Please adjust your travel plans to recognize delays of up to 5-10 minutes.
We would ask that homeowners move their vehicles from the streets between the times of 7:30 am – 5:00 pm to allow the setting and curing process and to help eliminate the deposits on your vehicle. Garbage Cans should be located off the roadway.
Please also recognize that the repaired roads may have coatings that until fully dried, may result in marks or deposits on your vehicle – especially if you are driving quickly on the roads. The Town of Hideout is not responsible for damages to your vehicle stemming from the road repair project.
Thank you for your understanding and patience while we complete this important work.
Town of Hideout Engineering Department
Timm Dixon, P.E. and Mayor Phil Rubin